Name | Plastic flange Covers,Plastic flange Protective,Plastic Protector for flange |
Material | LDPE |
Size | DN10 to DN1000 or according to drawings, samples and accurate size. |
Color | Yellow, Blue, white, Orange, Black, Red, Green, or other colors as per your requirements |
Thickness | OEM,ODM accepted. |
Marking | standard or as customer’s need |
working temperature | -50°C to 60 °C |
Usage |
Just simply push over the flange diameter, protect the face as well as the sides from damage,during storage, transit and laying. |
Application | All kinds of pipes, tubes, valves, flanges, and so on. |
MOQ | 100 pieces or as your requirement |
Productivity | 100000 pieces per day |
Package | standard woven bag,carton, or according customers requirement. |
Payment | T/T, L/C,Western Union |
Delivery time | 7 - 15 days after sample confirmation |
Loading port |
Ningbo or Shanghai, China |
Sample:
We can support 1-2 sample for you before place an order.
Custom-made service:
Welcome to offer drawings, samples for us to produce plastic products.
OEM,ODM are welcome too.
Who we are?
JJGF are manufacturer and specialized production plastic protection caps for pipe ,valve ,flange or other products about 20 years in Wenzhou China.
What’s products do JJGF supply?
lPlastic pipe end caps,plastic pipe end plugs,plastic valve covers,plastic flange protectors are main product .
lJGF have enough stocks in many sizes for immediate delivery.
lCustom made plastic caps. JJGF has a sound development of mold design,processing,manufacturing systems.
How to application?
Plastic Pipe End Caps are made from LDPE and easy to fit pipe,valve,flange etc.
a. Protecting pipeline in shipping,storage,installation from dust,animal,soil and keep pipe internal cleanning.
b.keep edge of pipe end completely.
c.Prevent paint from pipe internal when take protective measures,like spray lacquer.
Q: Are you Factory or Trading?
A: We are manufacturer and specialized in Plastic Pipe End Caps ,Plastic Flanges Protectors.
Q: How about your product?
A:We pursue high quality products,and support sample for your testing.
Q: When is the Lead time?
A:Almost products have in stock,and lead time is about 3 days after confirmation.
Mass production time is about 7 days after confirmation.
Q: What do you think the most important points for a good shopping experience?
A: Quick ,Professional ,In detail ,Responsible reply every question from customer in pre-sale service, in-sale service and after-sale service.
1) ISO 9001 - Our products are of high quality. We ensure our production record is of integrity and traceability.
2) National Test Report - Our products are credible and competitive in globle market, meeting the standard of GB/T13663.2-2000.
3) SGS
Contact us
Alice Li |
Wenzhou JUJING Pipe&Valve Fittings Co., Ltd. |
T: +86-577-85511666(803) | F: +86-0577-86900666 | M: +86 13396996565 Whatsapp:+86 13396996565 |
Website: http://www.cnjjgf.com |